Features:

  • Traffic
  • CCTV Installation
  • Hybrid Twisted-Pair / Fiber-Optic Communications
  • Traffic Signal Modifications
  • New Traffic Signal Installations
  • Signing and Striping
  • Three-Phase Traffic Control Plans for Street Widening

Project Description:

ADVANTEC staff was the Project Manager to complete a design project for the Irvine Company for the development of a new community called Oak Creek in Irvine, California. The project involved the preparation of PS&E for the widening of Alton Parkway from Jeffrey Road to Sand Canyon Road, and for all new roadway improvements within the community. A total of over 20 engineering plans consisting of two traffic signal modifications, three new traffic signal installation, signing and striping, and traffic control plans were prepared.

The project also required relocation of the City’s trunk fiber optic communication line, a communication hub cabinet, and CCTV installation at two locations. The design included the replacement of the existing fiber optic cable with the current City standard hybrid Signal/Fiber optic interconnect cable. The system design required that the existing communication facilities remain in service except during cut over to the new system.