Features:

  • 35 Closed Circuit TV Cameras
  • GigE Fiber optic communications
  • Hub equipment (see photo)
  • 2070 Controllers

Project Description:

ADVANTEC was retained by the City of Irvine to provide traffic signal system upgrade and ITS design and signal coordination along 19 major arterials within the City. Some of the corridors include Barranca Parkway, Irvine Center Drive, Von Karman Avenue, Jeffrey Road, Alton Parkway, University Drive, Campus Drive, Irvine Boulevard, Harvard Avenue, Bonita Canyon Road, Main Street, Bake Parkway, and Michelson Drive. Traffic signal system upgrade and ITS design includes the design of CCTV camera systems, fiber optics communications that tied into the City’s Gigabit Ethernet network, loop detectors, WWV antenna system at Caltrans intersections, and controller cabinets upgrade. See table below for a list of design equipment: