Features:

  • 14 CCTV Cameras
  • 12 Trailblazer Signs
  • 5 CMS
  • Fiber optic

Project Description:
ADVANTEC staff was the Project Manager leading a team of experts on two ITS projects for the City of Santa Ana. The projects required analysis of the corridor needs for CCTV, CMS and HAR, as well as an extensive fiber optic/twisted pair communication system. As part of this project, plans, specifications and estimates have been prepared for 14 CCTV locations. A total of 120 plan sheets were prepared for draft PS&E to meet a stringent TSM deadline.