Features:

  • CCTV
  • CMS
  • HAR
  • Fiber-Optics
  • VSAT

Project Description:

ADVANTEC staff was the Senior Advisor of the team that prepared PS&E of a Freeway Traffic Operation System (TOS) along 20 miles of Foothill Freeway (I-210) in Los Angeles County.  This project included the  implementing various freeway management infrastructure through the San Gabriel Valley and incorporated the concept of a “SMART” corridor. ADVANTEC staff assisted in the Project Report preparation, coordinated with other TOS projects and prepared PS&E for the complete system, including CCTV, CMS, HAR, fiber optic trunk communication and VSAT.